Project Name: Wastewater Diversion
Location: Edgeware Road, Christchurch
Contractor: MacDow/Fletcher/Scirt
Reason: Failed concrete wastewater pipes
Replacement: 66 metres of PKS plus DN1100 (supplied in 12 metre lenghts) with Electro fusion joints
Fittings: 31 degree bends x 4
Summary: Each end of the HDPE profile pipe was custom made with solid wall end sections for Gibault joining to the second stage.